France.

Photovoltaic Carport Installation at the Leclerc Supermarket Parking Lot, Plessis-Belleville.

Read the article

Project overview.

The E.Leclerc shopping center in Plessis-Belleville entrusted TSG France with the design and installation of a photovoltaic carport project aimed at optimizing its parking area and supporting its energy transition.
With a total installed capacity of 831.6 kWp, the system allows for self-consumption of electricity produced.
This project, designed and implemented by TSG France, contributes to reducing the site’s energy costs and reinforces its CSR image.

The solution delivered by TSG.

We handled the design, supply, and complete installation of a photovoltaic carport system for the E.Leclerc shopping center in Plessis-Belleville.
The project is based on nine Momsteel metal structures incorporating 1,890 JA Solar modules rated at 440 Wp each, for a total installed capacity of 831.6 kWp.

We deployed 15 Huawei inverters (SUN2000-36KTL and 100KTL models), connected to the main LV switchboard via AC junction boxes distributed along the posts and in the technical room.
The system is monitored by Solar-Log™ and equipped with Janitza meters for real-time tracking of self-consumption and surplus energy resale.
The installation includes reinforced grounding and optimized cabling (U1000 R2V, RS485).

This project highlights our expertise in photovoltaic solutions for large retail facilities, offering a turnkey, sustainable solution fully compliant with local standards and requirements.

Results and Impact.

With the installation of 831.6 kWp of photovoltaic carports, the E.Leclerc shopping center in Plessis-Belleville now benefits from local renewable energy generation, enabling significant self-consumption.
The project inaugurated in April 2025 as part of the site’s energy transition initiative enhances the use of the parking area while strengthening the site’s CSR image.
Real-time monitoring via Solar-Log and Janitza meters ensures precise tracking of energy performance.
This achievement demonstrates the Leclerc Group’s commitment to energy transition and the optimization of its infrastructure.

  • Total installed capacity: 831.6 kWp
  • Number of solar panels: 1,890 JA Solar JAM54D40 LB modules
  • Panel unit power: 440 Wp
  • Number of carports: 9 Momsteel metal structures
  • Carport configuration: 6 carports with 182 modules + 3 carports with 266 modules
  • Inverters installed: 15 Huawei units (3 × 100KTL-M2 + 12 × 36KTL-M3)
  • Production type: Self-consumption + surplus resale
  • Monitoring system: Solar-Log Base 2000 + Janitza UMG604
  • MV/LV transformer: 1,000 kVA

TSG’s flagship projects.

Discover how we support our customers to enable the transition to responsible mobility.